{"id":16225,"date":"2008-11-06T19:00:00","date_gmt":"2008-11-07T02:00:00","guid":{"rendered":"https:\/\/www.sunnymeadowswater.com\/?p=16225"},"modified":"2008-11-06T19:00:00","modified_gmt":"2008-11-07T02:00:00","slug":"minutes-2008-11-06","status":"publish","type":"post","link":"https:\/\/www.sunnymeadowswater.com\/?p=16225","title":{"rendered":"Minutes 2008-11-06"},"content":{"rendered":"<h1>Sunny Meadows Missoula County Water and Sewer District Minutes\u00a0<\/h1>\n<h2>Board of Director\u2019s Meeting, Our Savior\u2019s Lutheran Church<\/h2>\n<h2>November 6, 2008<\/h2>\n<h4>Board Members Present: Cyndie Winchell, Mike Huber, Bill Engelstad &amp; Mike Lilley.<\/h4>\n<h4>Also Attending: Craig Progeza, water specialist, Josh Patterson, Owner Patterson Engineering, Adam<\/h4>\n<h4>Pummel, contractor, Bob Zachariasson &amp; Paula Niccum, homeowners, and Joan Kuehn, District Secretary<\/h4>\n<p>1. Roll Call<\/p>\n<p style=\"padding-left: 30px;\">a. President, Mike Lilley, called the meeting to order at 7:00 P.M. Only board member<\/p>\n<p style=\"padding-left: 60px;\">Tom Walters was absent.<\/p>\n<p>2. Approval of Minutes, Cyndie moved, Mike H. seconded*** and the minutes from October 6,<\/p>\n<p style=\"padding-left: 30px;\">2008 were unanimously approved.<\/p>\n<p>3. To prioritize Josh, Adam, and Craig\u2019s time, items involving them were moved forward on<\/p>\n<p style=\"padding-left: 30px;\">the agenda:<\/p>\n<p>4. EPA Well status:<\/p>\n<p style=\"padding-left: 30px;\">a. The DEQ approval arrived Tuesday.\u00a0<\/p>\n<p style=\"padding-left: 30px;\">b. Testing to assure the wells are from the same aquifer was in process.<\/p>\n<p style=\"padding-left: 30px;\">c. A tolulene \u201chit\u201d was discussed (most likely from the well drilling). .9ppm-2ppm range\u2019s<\/p>\n<p style=\"padding-left: 60px;\">OK. There is currently a waiver on testing. An additional (fourth test each year could be<\/p>\n<p style=\"padding-left: 60px;\">required if tolulene is a concern, which could cost $1-2000. We don\u2019t want to lose the<\/p>\n<p style=\"padding-left: 60px;\">waiver. Brian is arranging the testing and the EPA pays for this.\u00a0<\/p>\n<p style=\"padding-left: 60px;\">i. The EPA has requested final billing from Mike L.\u00a0<\/p>\n<p style=\"padding-left: 60px;\">ii. Craig is awaiting the Army Corps of Engineers, but basically the work is completed and<\/p>\n<p style=\"padding-left: 90px;\">works well for the district.<\/p>\n<p>5. Meters:<\/p>\n<p style=\"padding-left: 30px;\">a. Only one meter still needs replacement and Judge Deschamps assures it is his fault that it<\/p>\n<p style=\"padding-left: 60px;\">isn\u2019t completed yet. Adam will connect and get it done soon.\u00a0<\/p>\n<p style=\"padding-left: 30px;\">b. Adam will call or email Mike L when it is done.<\/p>\n<p>6. Engineering:<\/p>\n<p style=\"padding-left: 30px;\">a. Two options were discussed and it was decided to hault the pipe replacement at the point<\/p>\n<p style=\"padding-left: 60px;\">where 3\u201d PVC pipe is in a \u201cT\u201d in the road above Kuehn\u2019s home. The per-foot price, hard<\/p>\n<p style=\"padding-left: 60px;\">digging near gas\/electrical\/phone lines, pressure testing concerns, safety, and savings lead<\/p>\n<p style=\"padding-left: 60px;\">to a decision to leave the pipe that seems to be in good shape in place.\u00a0<\/p>\n<p style=\"padding-left: 30px;\">b. Tank, booster station, and upper connection testing will all happen at the same time.\u00a0<\/p>\n<p style=\"padding-left: 30px;\">c. All surfaces must be disinfected.<\/p>\n<p style=\"padding-left: 30px;\">d. The shut-down will likely happen within one day.\u00a0<\/p>\n<p>7. Schedule:<\/p>\n<p style=\"padding-left: 30px;\">a. One month remains on the contracted time.<\/p>\n<p style=\"padding-left: 30px;\">b. The tank is on site<\/p>\n<p style=\"padding-left: 30px;\">c. The floor was finished today.<\/p>\n<p style=\"padding-left: 30px;\">d. A roof and sides will be built by the weekend (barring weather delays).<\/p>\n<p style=\"padding-left: 30px;\">e. Ladders, scaffolding, and the basic structure will be up next week.<\/p>\n<p style=\"padding-left: 30px;\">f. The power is in and the booster pump is ready to go.<\/p>\n<p style=\"padding-left: 30px;\">g. The open hole at the top will be covered and then re-opened to finish the project.<\/p>\n<p style=\"padding-left: 30px;\">h. Final finish grading will probably happen in the spring. Fencing and seeding may delay<\/p>\n<p style=\"padding-left: 60px;\">until warm weather, also.<\/p>\n<p>8. Financial Report (to the end of September)<\/p>\n<p style=\"padding-left: 30px;\">Cyndie reported no one is late paying their water bill! Some even have credit!<\/p>\n<p style=\"padding-left: 30px;\">Total assets $61,601.84, with a balance of $124,166.67 with the county<\/p>\n<p style=\"padding-left: 30px;\">Revenue: $589,897.00<\/p>\n<p style=\"padding-left: 60px;\">a. EPA grant $5,886.86<\/p>\n<p style=\"padding-left: 60px;\">b. Treasure State Endowment Program $125,619.20<\/p>\n<p style=\"padding-left: 60px;\">c. Metered water sales $4589.90<\/p>\n<p style=\"padding-left: 60px;\">d. Sewer Charges $44<\/p>\n<p style=\"padding-left: 60px;\">e. Investment earnings $102.92<\/p>\n<p style=\"padding-left: 60px;\">f. State revolving Fund $30,335.00<\/p>\n<p style=\"padding-left: 30px;\">Expenses: $ 150,150.24<\/p>\n<p style=\"padding-left: 60px;\">a. Office Supplies $ 57.26 29%<\/p>\n<p style=\"padding-left: 60px;\">b. Operating 130.35 30%<\/p>\n<p style=\"padding-left: 60px;\">c. Postage 42.00 12%<\/p>\n<p style=\"padding-left: 60px;\">d. Dues\/Membership 413.43 131%<\/p>\n<p style=\"padding-left: 60px;\">e. Phone 32.44 15%<\/p>\n<p style=\"padding-left: 60px;\">f. Audit Fees 322.00 15%<\/p>\n<p style=\"padding-left: 60px;\">g. Contracted Services 450.00 26%<\/p>\n<p style=\"padding-left: 60px;\">h. Consultants 100.00 21%<\/p>\n<p style=\"padding-left: 60px;\">i. Architect\/engineering 33,208.13 163%<\/p>\n<p style=\"padding-left: 60px;\">j. Water Systems MTC 331.00 20%<\/p>\n<p style=\"padding-left: 30px;\">Bill moved, Mike H. seconded *** and the financial report was approved with a unanimous vote.<\/p>\n<p>9. Public Input\u2026none<\/p>\n<p>10. Adjournment At 7:50 P.M., Cyndie moved\/ Bill seconded***, and the meeting unanimously<\/p>\n<p>adjourned.<\/p>\n<p>A Homeowner\u2019s Association Discussion followed<\/p>\n<p>\u00a0*** Vote taken<\/p>\n<p>\u00a0District website reminder: http:\/\/www.sunnymeadows.dnsalias.com\/index.shtml<\/p>\n<p>Respectfully submitted by Joan Kuehn, November 10, 2008.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sunny Meadows Missoula County Water and Sewer District Minutes\u00a0 Board of Director\u2019s Meeting, Our Savior\u2019s Lutheran Church November 6, 2008 Board Members Present: Cyndie Winchell, Mike Huber, Bill Engelstad &amp; Mike Lilley. Also Attending: Craig Progeza, water specialist, Josh Patterson, Owner Patterson Engineering, Adam Pummel, contractor, Bob Zachariasson &amp; Paula Niccum, homeowners, and Joan Kuehn, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-16225","post","type-post","status-publish","format-standard","hentry","category-minutes"],"_links":{"self":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts\/16225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16225"}],"version-history":[{"count":0,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts\/16225\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}