{"id":16208,"date":"2008-07-03T18:00:00","date_gmt":"2008-07-04T01:00:00","guid":{"rendered":"https:\/\/www.sunnymeadowswater.com\/?p=16208"},"modified":"2008-07-03T18:00:00","modified_gmt":"2008-07-04T01:00:00","slug":"resolution-2008-12-gw-contract-amendment","status":"publish","type":"post","link":"https:\/\/www.sunnymeadowswater.com\/?p=16208","title":{"rendered":"Resolution 2008-12 GW Contract Amendment"},"content":{"rendered":"<p style=\"margin-bottom: 0.12in; text-transform: uppercase;\" align=\"JUSTIFY\"><b>A resolution approving amendment of the contract with great west engineering<\/b><\/p>\n<p style=\"margin-bottom: 0.12in; text-transform: uppercase;\" align=\"JUSTIFY\"><b>BE IT RESOLVED BY THE BOARD OF directors of the sunny meadows Missoula county water and sewer district:<\/b><\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> the District has an existing contract dated January 18, 2006 with Great West Engineering to provide services related to the initial stages of its current water system upgrade project; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> the District complied with state funding agency guidelines in procuring engineering services from Great West Engineering; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> the District owns and operates a water system within the Clark Fork River Basin near East Missoula, MT; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> the EPA has agreed to address theimpacts to our water system of ongoing activities to remove the Milltown dam; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> time is of the essence in replacing the well, so as to minimize the potential for increased health and safety risks; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> the EPA has offered to pay or reimburse all costs associated with replacing our remaining shallow well with a new, deeper well; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> in order to accomplish the well replacement in a timely fashion, it would be most efficient to utilize the District&#8217;s ongoing relationship with Great West Engineering; and<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>WHEREAS,<\/b> in order to accomplish the well replacement, it will be necessary to enter into an agreement with both the EPA and Great West Engineering.<\/p>\n<p style=\"margin-bottom: 0.12in;\"><b>THEREFORE BE IT RESOLVED,<\/b> that the District approve the contract amendment (Amendment No. 4) to the existing contract with Great West Engineering.<\/p>\n<p style=\"margin-bottom: 0.12in;\">\n<p style=\"margin-bottom: 0.12in;\">PASSED AND ADOPTED this 3<sup>rd<\/sup> day of July, 2008<\/p>\n<p style=\"margin-bottom: 0in;\"><span style=\"font-family: Arial, sans-serif;\">Signed: <\/span><span style=\"font-family: Arial, sans-serif;\"><span style=\"text-decoration: underline;\"> _____<\/span><\/span><\/p>\n<p style=\"margin-bottom: 0in;\">\u00a0<\/p>\n<p style=\"margin-bottom: 0in;\"><span style=\"font-family: Arial, sans-serif;\">Name: <\/span><span style=\"font-family: Arial, sans-serif;\"><span style=\"text-decoration: underline;\">Michael Lilley <\/span><\/span><\/p>\n<p style=\"margin-bottom: 0in;\">\u00a0<\/p>\n<p style=\"margin-bottom: 0in;\"><span style=\"font-family: Arial, sans-serif;\">Title: <\/span><span style=\"font-family: Arial, sans-serif;\"><span style=\"text-decoration: underline;\">District President _____<\/span><\/span><\/p>\n<p style=\"margin-bottom: 0in;\">\u00a0<\/p>\n<p style=\"margin-bottom: 0in;\"><span style=\"font-family: Arial, sans-serif;\">Date: <\/span><span style=\"font-family: Arial, sans-serif;\"><span style=\"text-decoration: underline;\"> _____<\/span><\/span><\/p>\n<p style=\"margin-bottom: 0in;\">\u00a0<\/p>\n<p>\u00a0<\/p>\n<p style=\"margin-bottom: 0in;\"><span style=\"font-family: Arial, sans-serif;\">Attested: <\/span><span style=\"font-family: Arial, sans-serif;\"><span style=\"text-decoration: underline;\"> _____<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A resolution approving amendment of the contract with great west engineering BE IT RESOLVED BY THE BOARD OF directors of the sunny meadows Missoula county water and sewer district: WHEREAS, the District has an existing contract dated January 18, 2006 with Great West Engineering to provide services related to the initial stages of its current [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-16208","post","type-post","status-publish","format-standard","hentry","category-resolution"],"_links":{"self":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts\/16208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16208"}],"version-history":[{"count":0,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=\/wp\/v2\/posts\/16208\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sunnymeadowswater.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}